1
|
Understand and conduct all inspection and
testing in conformance with the applicable code requirements.
|
|
2
|
Conduct trip tests on dry systems with the
control valve partially open and when required using the inspectors
test connection. |
|
3
|
Demonstrate the ability to drain all areas
of the sprinkler system, reset the clapper valve, insert the
priming water and ensure proper air pressure. |
|
4
|
Conduct water flow alarm tests on wet and
dry systems. On wet systems by using the inspectors test connection.
Dry pipe systems water flow alarm test can be done by using
the alarm test connection located at the dry pipe valve. Test
all mechanical and electrical alarms. |
|
5
|
Conduct inspection of valves to determine
that they are in the normal open or closed position, properly
sealed, locked, supervised, accessible, provided with appropriate
wrenches, free from leaks and appropriate identification.
|
|
6
|
Conduct inspections of fire department connections
to determine that they are visible, accessible, couplings
are not damaged, caps in place etc. |
|
7
|
Conduct a main drain test by opening the main
drain valve fully and record the difference between the static
and flow pressure. This is done to determine there are no
obstructions in the water supply. |
|
8
|
Conduct tests on all initiating and transmitting
devices to determine proper operation. |
|
9
|
Sprinkler system supervisory devices shall
be tested to determine operation and proper annunciation.
|
|
10
|
Conduct inspection of sprinkler heads for
damage, corrosion or accumulations of grease, paint or other
deposits and proper clearances to the deflector. |
| 11 |
Conduct inspection of spare sprinklers to
determine the proper number and type of sprinklers and a sprinkler
wrench for each type of sprinkler. |
| 12 |
Conduct inspection of the pipe and fittings
to determine that the pipe and fittings are in good condition
and free of mechanical damage, leakage, corrosion and misalignment.
|
| 13 |
Conduct inspection of hangers and seismic
braces to determine that they are not damaged or loose. |
| 14 |
Conduct inspection of Gauges to determine
that they are in good condition and that the normal water
supply pressure and air pressure is maintained. |
| 15 |
Conduct tests to determine that the freezing
point of solutions is acceptable by measuring the specific
gravity with a hydrometer or refractometer. |
| 16 |
Conduct inspection of buildings prior to the
onset of freezing weather. Buildings with wet pipe systems
shall be inspected to verify that windows, skylights, doors,
ventilators etc. do not expose water-filled sprinkler piping
to freezing and that adequate heat is available. |
| 17 |
Conduct inspection of control valves to determine
they are in the normal open or closed position, properly sealed,
locked, supervised, accessible, provided with appropriate
wrenches, free from leaks and appropriate identification. |
| 18 |
Conduct a test of the control valves by operating
through its full range and returned to its normal position. |
| 19 |
Prepare clear and accurate inspection and
test reports and maintain the records for the authority having
jurisdiction. |
| 20 |
Communicate with the owner or authorized agent
and make recommendations for deficiencies that need to be
rectified. |
| 21 |
Communicate clearly with the authority having
jurisdiction and advise him of any problems or unsafe conditions
in the building. |